Pics -Part 1 - Old School, Remodeling/Demolition and New Upper Dublin HS Complex
  First PagePrevious Page Next PageLast Page  
Click on images to enlarge
Back to Photo Albums
7-18-09: This is another picture of the back (parking lot side) of the new construction. They are now giving tours if in
7-18-09: This is another picture of the back (parking lot side) of the new construction. They are now giving tours if interested.
7-18-09: Just so you don't think they have forgotten classrooms, these are some classrooms in the front extending from
7-18-09: Just so you don`t think they have forgotten classrooms, these are some classrooms in the front extending from the pool area to the front main entrance.
10/11/09: New front entrance to the school. Starting to look nice.
10/11/09: New front entrance to the school. Starting to look nice.
10/11/09: To the left of the last picture. The classrooms from the new entrance to the pool/gym area.
10/11/09: To the left of the last picture. The classrooms from the new entrance to the pool/gym area.
10/11/09: Both sides of the new entrance. The performaing arts center will be to the right of this.
10/11/09: Both sides of the new entrance. The performaing arts center will be to the right of this.
11/20/09: This is an interior view of the new pool. The pool is configured so that you can swim lengthwise 8 lanes or wi
11/20/09: This is an interior view of the new pool. The pool is configured so that you can swim lengthwise 8 lanes or widthwise 12 lanes and the length can be adjusted. There are many more built-in bleachers than the old pool. It is very impressive.
12/12/09: The front of the new building.
12/12/09: The front of the new building.
12/12/09: Entrance to the Athletic area (gym and pool).
12/12/09: Entrance to the Athletic area (gym and pool).
12/12/09: Inside entrance to the Athletic area.
12/12/09: Inside entrance to the Athletic area.
12/12/09: the new gym - with large bleachers on both sides.
12/12/09: the new gym - with large bleachers on both sides.
12/12/09: Another view of the gym.
12/12/09: Another view of the gym.
12/12/09: The new pool. A meet was about to start.
12/12/09: The new pool. A meet was about to start.
12/12/09: Check out the stands which are on a balcony. These is some AC on in there because it was actually cool doing t
12/12/09: Check out the stands which are on a balcony. These is some AC on in there because it was actually cool doing the meet.
12/12/09: One more picture of the pool.
12/12/09: One more picture of the pool.
1/12/10: The old (but built after we graduated -- so what does that make us?) library has been torn down. They are using
1/12/10: The old (but built after we graduated -- so what does that make us?) library has been torn down. They are using the old gym for the library right now.
1/12/10: Another shot of where the old library used to be - next to the Auditorium.
1/12/10: Another shot of where the old library used to be - next to the Auditorium.
1/29/2011: OK, it has been a year since I posted any pictures of the new school. All the work has been done inside this
1/29/2011: OK, it has been a year since I posted any pictures of the new school. All the work has been done inside this past year so not much to show. The new section opened on 1/3/11 and this weekend was a tour for the community, so I went and took some pictures. What a GREAT looking school!
1/19: This is another view of the main entrance. This is right across the street from the township building. We just had
1/19: This is another view of the main entrance. This is right across the street from the township building. We just had 16 inches of snow this week (for those of you who now live in warmer climates).
  First PagePrevious Page Next PageLast Page